Case Studies - Page 1 of 5.

High-Performance UV CIPP Rehabilitation with Trelleborg Mainline PowerLight Pro

April 14, 2026

A large industrial processing facility required rehabilitation of a critical underground piping system carrying a combination of stormwater and process sewer flows. The existing infrastructure – comprised of aging vitrified clay (VCP) and reinforced concrete pipe (RCP) – was experiencing severe infiltration, structural deterioration, and chemical corrosion.

Restoring Critical Plumbing Infrastructure at a 24/7 Las Vegas Casino — Without Shutdowns

March 17, 2026

This project exemplifies the power of NuFlow’s trenchless technology when paired with an experienced, highly skilled Certified Contractor. Bill Howe Plumbing’s ability to execute a complex, high-stakes repair in one of the most demanding environments in the country demonstrates what is possible when innovation, planning, and expertise align.

Teamwork on the Mountain: Completing a 4,300-Foot Pipe Rehabilitation in Half the Time

February 24, 2026

Two NuFlow Certified Contractors joined forces to complete a 4,300-foot in-building pipe rehabilitation at a Colorado ski resort – compressing a 180-day schedule into just 90 days using NuDrain pull-in-place CIPP, NuCure UV curing, and brush coating technologies.

A Smooth Solution for a New Homeowner’s Unexpected Plumbing Crisis

December 18, 2025

What started as a stressful setback became an opportunity to learn the value of modern plumbing solutions. Thanks to the trenchless approach, the couple preserved their home, avoided construction chaos, and saved nearly $30,000.

Small-Diameter CIPP Solution Solves Big Leak at Barkley Dam Power Plant

July 31, 2025

NuFlow Services of St. Louis successfully repaired leaking conduits at the Barkley Dam Power Plant using trenchless NuDrain CIPP technology. By addressing both groundwater intrusion and an unexpected tunnel wall leak, the team delivered a cost-effective solution that met the high standards of the U.S. Army Corps of Engineers (USACE). Groundwater Intrusion Threatens Barkley Dam […]

High-Rise, High-Impact: NuFlow Midwest’s Effective Pipe Rehabilitation Solutions for Complex Urban Projects

March 26, 2025

NuFlow Midwest, in partnership with Althoff Industries, completed a large-scale pipe rehabilitation in a 60-story Chicago high-rise, resolving severe leaks and deterioration in residential lateral lines and kitchen sanitary mains.

No Dig, Big Impact: How CIPP Lining Saved Time and Costs for a Hospital Expansion

February 26, 2025

When a local children’s hospital needed to renovate a newly acquired facility for a skilled nursing and subacute center, outdated cast iron pipes posed a major challenge.

Residents Raise a Glass to a Restored Plumbing System

February 26, 2025

When a five-story residential condominium with commercial spaces below faced severe plumbing failures due to aging cast iron pipes, a skilled team stepped in with NuFlow’s NuDrain CIPP process to deliver a cost-effective, trenchless repair solution.

Trenchless Triumph: How Re-Nu America Restored Plumbing and Peace of Mind for a Las Vegas Community

January 4, 2025

A couple had recently moved into their dream home in a suburban neighborhood near Las Vegas, NV. Built in the 1970s as part of an HOA community, the house appeared ideal—until a week after moving in, when sewer backups in the plumbing system began disrupting their lives. The Plumbing Problem Nobody Saw Coming The home […]

Revitalizing Historic Brewery Pipes with Modern Trenchless Technology

December 7, 2024

In a historic brewery, aging drainage pipes presented mounting challenges to daily operations, with pitted, deteriorated infrastructure threatening efficiency and reliability. Faced with complex underground layouts, tight timeframes, and unexpected obstacles, NuFlow Services of Upstate NY, LLC brought advanced trenchless pipe repair technology to the task, revitalizing the brewery’s pipes without interrupting production. Using NuDrain […]

Scroll to Top