Teamwork on the Mountain: Completing a 4,300-Foot Pipe Rehabilitation in Half the Time

February 24, 2026

Two NuFlow Certified Contractors joined forces to complete a 4,300-foot in-building pipe rehabilitation at a Colorado ski resort – compressing a 180-day schedule into just 90 days using NuDrain pull-in-place CIPP, NuCure UV curing, and brush coating technologies.

Seeing is Believing

June 14, 2022

The busy kitchen at a 400-room hotel in Tampa didn’t have time for drain backups. But when their grease lines began causing problems, they called a NuFlow Certified Contractor for a camera inspection. The video results of the inspection showed such serious buildup and corrosion that the hotel decided immediately to camera other parts of […]